We Trade Claims for Test Data

Every design iteration is validated against a documented test matrix. If we advertise a number on this site, it's because a test rig measured it — not because a datasheet template said so.

Design

Parameters defined from requirements and DFMEA

Prototype

First-article boards on the test bench

Validation

Full test matrix against published thresholds

Production

Per-unit functional test + batch reliability samples

What We Validate, and How

Thermal Testing

IR thermography and load banks measure temperature rise at 50A/60A continuous in ambient chambers. The published +17°C / +31°C figures come from these rigs, with logged waveforms available.

Surge & Transient Immunity

TVS clamp performance is verified with applied surge pulses and inductive-load switching; clamp voltage and recovery time are recorded on every validation revision.

Protection Response

Overvoltage, undervoltage, overcurrent, and short-circuit triggers are tested with programmed power supplies and electronic loads, measuring trip thresholds and latched-state response.

Communication Bus Tests

CAN 2.0B and RS485 Modbus framing, timing, fault-code reporting, and charger handshake are validated with protocol analyzers and simulated vehicle/charger nodes.

Balancing Performance

Cell-mismatch scenarios are created with injected imbalance, then we log convergence time, transfer current, and resolution until delta drops below 5 mV.

Soak & Cycle Testing

Long-run charge/discharge cycling and thermal-soak trials replicate daily Indian duty cycles, catching drift and early-life failures before fleet deployment.

Validated With Real Packs, Not Just Benches

Final validation happens on assembled battery packs from partner integrators and OEM programs.

1

Pack Integration Trials

The BMS is mounted, wired, and tested inside the actual enclosure with the cell layout it will protect.

2

Vehicle-Level Checks

CAN handshake with your controller, charging behaviour, and regen response are verified on the running vehicle.

3

Report & Sign-Off

Results are compiled into a validation summary your engineering team can review and approve before sampling.

Want to See the Test Rigs?

Visit our lab in Noida or review validation reports under NDA.

Request a Quote Talk to an Engineer
Request a Quote WhatsApp